2026-06-23 Qunfeng Machinery has been selected for the “List of Advanced-Level Smart Factory Projects (2026)” by the Fujian Provincial Department of Industry and Information Technology. By deeply integrating cutting-edge 5G and AI technologies, the company has established an end-to-end intelligent system encompassing everything from concrete production lines and R&D for non-fired block machines to final manufacturing, thereby fully empowering the building materials machinery industry to transition toward high-quality, smart operations.
Read More
2026-06-18 From June 10 to 14, 2026, the 24th Syria International Exhibition for Construction and Building Materials (BUILDEX 2026) was grandly held at the Exhibition Center in Damascus, the capital of Syria. As a national-level “Little Giant” enterprise—recognized for specialization, refinement, uniqueness, a
Read More
2026-06-05 In the global block making machine industry, it is very important to choose a manufacturer with advanced technology and comprehensive service. The following are the top ten recommendations of block making machine manufacturers in 2026, combined with international market performance, user reputation
Read More
2026-05-25 The track-laying passage of Changjiu High-speed Railway was fully opened recently, with construction progress constantly hitting new highs. As a vital component of the Beijing-Hong Kong corridor within the national “Eight Verticals and Eight Horizontals” high-speed rail network, the accelerated prog
Read More
2026-04-28 Over the past decade, the first phase of the China-Pakistan Economic Corridor (CPEC) has achieved remarkable success. With the launch of the second phase of the CPEC plan, China and Pakistan are deepening their cooperation in manufacturing capacity, creating a great demand for capacity and requiring
Read More
2023-08-15 According to China Belt and Road Network, on June 1, at the 14th International Infrastructure Investment and Construction Summit Forum, China Road and Bridge Engineering Co., Ltd. and the Mozambique Ministry of Transport and Communications signed the "Mozambique Maputo EN1 Line Light Rail Project Memorandum". This is another large-scale project undertaken by CRBC in Mozambique after the completion of the Maputo Bridge. While changing the appearance of Mozambique's infrastructure, it also brings new opportunities for Mozambique's industrial development.
Read More